Existing bottom
Ideal slope line
Fill (build up)
Dig (remove)
String line (datum)
Summary
Per point
| # | Dist (ft) | Depth (in) | Ideal (in) | Adjust | Elev (in) |
|---|
Per section
| Section | Fill | Dig |
|---|
Depths are measured from a level string line (0") down to the trench bottom. Larger depth = lower bottom.
| # | Dist (ft) | Depth (in) | Ideal (in) | Adjust | Elev (in) |
|---|
| Section | Fill | Dig |
|---|